No separate connection box
No docking station or tap box to specify, buy, wait for, or find wall space for. It is one purchase order line and one enclosure.
Standard configurations · continental US
Manual transfer switches to 1200 A with integral cam-lock generator connectors, and enclosed service entrance breakers to 2000 A. ABB breakers, fully rated bus, service entrance rated, UL listed. We try to keep them in stock, so most orders are on site in well under four weeks. Four weeks is the outside number, not the usual one.
The gap
A standard unit from a mainstream supplier is quoted at forty to fifty weeks, because it is not built until it is ordered. That number does not stay inside the switchgear line item — it sets your energization date, and the energization date sets everything after it.
Weeks from release to delivered on site
Against the top of the market range. The generator connection stops being the thing that holds up energization.
Four weeks instead of forty, at worst, because the unit already exists. Same specifications, same ratings, same listing.
Not a callback, not a discovery meeting. A date by email within one business day of the request.
Why four is possible
That is the whole answer. The forty-week number is a queue, not a build — a one-off waits behind a national backlog before anyone touches it. We do not order these after you do. We carry the standard configurations on the shelf, because we have watched what a forty-week switchgear quote does to a schedule, and we would rather hold the inventory than let the generator connection be the thing that moves your energization date.
Four weeks is the outside number, not the usual one. When the shelf has your configuration on it — which is almost always — you get it well inside four weeks. In a genuinely busy stretch, when stock has to be replenished, it can run the full four. That is the honest range, and the slow end of it still beats the market by ten to one.
Where the four weeks does not apply. Genuinely bespoke work is bespoke work, and it gets a real date instead of this one. The four weeks covers the standard configurations published below, delivered anywhere in the continental US.
Integral generator connection
The cam-lock inlets are not an accessory bolted on afterward. Series 16 connectors are mounted on the switch and bus-barred inside the enclosure before it ships — ten inlets on the 600, fifteen on the 1200, rated 400 A each. What arrives on your site is one piece of gear that the generator plugs directly into.
No docking station or tap box to specify, buy, wait for, or find wall space for. It is one purchase order line and one enclosure.
Nothing to run between a connection box and the switch. The conduit, the fittings, and the labor to pull that feeder all come off the estimate.
That leg is terminated and tested at the shop, not on a ladder at two in the morning. Phase rotation is right because it was made right.
What we sell
Every specification is published on this site. Nothing here needs a discovery call before you can put it on a purchase order.
3Ø · 10 cam-lock inlets · 4 weeks
3Ø · 15 cam-lock inlets · 4 weeks
400–2000 A · to 600 V AC · 4 weeks
How ordering works
Send the request. You get a confirmed ship date back within 24 hours, and the gear is delivered within four weeks — usually sooner.