The equipment decision that turns a 40–50 week custom MTS timeline into a four-week delivered plan.

The problem

40–50 week lead times are killing schedules.

40–50WEEKS
CUSTOM MTS MARKET RANGE
4WEEKS
DANBAR
Timeline comparing the 40 to 50 week industry range for a custom manual transfer switch with a four week delivered lead time.

The cost of waiting

Ten months is not a rounding error.

10×FASTER TO SITE
  • Temporary powerRental gensets and fuel burning every month.
  • Schedule damagesGear on the critical path puts the GC’s clock on you.
  • Financing carryInterest accrues on a building that cannot energize.
  • Deferred revenueTen months of an asset sitting dark, earning nothing.

The trap

Order it at signing, or miss your deadline.

Best seller 1 of 2

600A / 480V manual transfer switch.

  • Integral cam-lock generator connectors
  • Fully rated bus, 100% of frame
  • ABB breakers, mechanically interlocked
  • Service entrance rated
  • NEMA 1 / 3R / 4X, 65 kAIC
600AMPS
480VOLTS480Y/277V 4-WIRE WYE OR 480V 3-WIRE DELTA
4WEEKSDELIVERED, CONTINENTAL US

Best seller 2 of 2

1200A / 208V manual transfer switch.

  • Integral cam-lock generator connectors
  • Fully rated bus, 100% of frame
  • ABB breakers, mechanically interlocked
  • Service entrance rated
  • NEMA 1 / 3R / 4X, 65 kAIC
1200AMPS
208VOLTS208Y/120V 4-WIRE WYE
4WEEKSDELIVERED, CONTINENTAL US

Installed cost

The generator connection is already in the box.

Every one of those is labor and material the electrician does not price, install, or come back to fix.

Representative specification

600A MTS data.

SpecValue
Current rating600 A
Voltage480Y/277 V, 4-wire wye or 480 V, 3-wire delta
Poles3-pole or 4-pole
BusFully rated, 100% of frame
BreakersABB
TransferManual, mechanically interlocked
Generator interfaceIntegral Series 16 / E1016 cam-lock, 2 rows × 5
EnclosureNEMA 1 indoor / NEMA 3R outdoor / NEMA 4X stainless
SCCR65 kAIC
Lead time4 weeks, continental US

Configurations shown are representative. Final ratings confirmed at order entry.

Representative specification

1200A MTS data.

SpecValue
Current rating1200 A
Voltage208Y/120 V, 4-wire wye
Poles3-pole or 4-pole
BreakersABB
BusFully rated, 100% of frame
TransferManual, mechanically interlocked
Generator interfaceIntegral Series 16 / E1016 cam-lock, 3 rows × 5
EnclosureNEMA 1 / 3R / 4X
SCCR65 kAIC
Lead time4 weeks, continental US

Configurations shown are representative. Final ratings confirmed at order entry.

Already in the field

Two years in major retail.

Why we can and they cannot

It is the company, not the gear.

Decision pointMajor OEMDanbar Power Solutions
Business modelVolume catalog productionCustom fabrication shop, UL listed
Your order isOne of thousands against a forecastBuilt for your job
Queue positionBehind a national backlogDirect to the shop floor
Chain to siteFactory → rep → distributor → youShop → us → you
Custom MTS lead time40–50 weeks market range4 weeks, delivered

Both routes are UL listed. The gap is queue and structure, not build quality — and the OEM is still the right call on spec-locked, closed-transition, and paralleling work.

Second equipment line

Enclosed service entrance breakers through 2000A.

Individually mounted, service entrance rated and enclosed—selected for the service, environment, and trip function the job requires.

  • 400 / 600 / 800 / 1200 / 1600 / 2000 A frames
  • Up to 600 V AC, 3-phase
  • NEMA 1 indoor / NEMA 3R outdoor / NEMA 4X stainless
  • Thermal-magnetic or electronic; LSIG available
  • 4-week continental-US target

The decision

You can have it in four weeks. Or you can explain forty.

Send us the amps, the volts, and the date. You get a firm number and a firm delivery, in writing, this week.